Build details:
• One single Keurig used (K350/300 2.0 Brewer)
• The only non-Keurig materials are adhesives and the 12v external power supply
• Used basic tools—rotary, heat gun, common hand tools, etc.
• No plans…just a general idea of how things should be constructed
• Build time: 199 hours, 56 minutes, and 36 seconds (read: hands on things)
In a galaxy far, far away from the clutches of cancellation, a hero quietly worked…
For today’s edition of “Deal of the Day,” here are some of the best deals…
https://youtu.be/KJpYWOJNVGY?si=vsu_6JYvYYO9VBpH Ever wondered why we use those adorable yet cringey words for our loved ones?…
https://youtu.be/M6hGjh9SJ_M?si=0eD0KXZHDjnaa5RQ From intricate communication dances to their uncanny ability to navigate vast distances with pinpoint…